
E-S4HCON2022 Study Guide: Latest [Sep 22, 2023] Realistic Verified E-S4HCON2022 Dumps
E-S4HCON2022 Questions & Practice Test are Available On-Demand
SAP E-S4HCON2022 certification exam is designed for technology specialists who are responsible for managing and executing SAP S/4HANA conversions and system upgrades. SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade certification validates their expertise in planning, executing, and managing the conversion of SAP systems to the latest version of SAP S/4HANA. SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade certification also confirms their ability to perform system upgrades, including the technical aspects of the upgrade process, such as system sizing, data migration, and system configuration.
NEW QUESTION # 13
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.
- A. Credentials of user DDIC in the development client of the development system
- B. Credentials of a named user in client 000 of the shadow system
- C. Credentials of a named user in the development client of the development system
- D. Credentials of user DDIC in client 000 of the shadow system
Answer: C
NEW QUESTION # 14
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
- A. Benchmark tool
- B. SAP S/4HANA conversion including DMO
- C. DMO without system update
- D. Prerequisite check
- E. SAP S/4HANA conversion without DMO
Answer: B,D,E
NEW QUESTION # 15
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Uninstall Fiori apps not released for SAP_UI 7.50
- B. Install add-on SAP Gateway 7.50
- C. Uninstall industry extensions not supported by SAP S/4HANA
- D. Delete client 066 (Early Watch Client)
Answer: A,D
NEW QUESTION # 16
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.
- A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
- B. You need to build up an SI check framework by applying SAP Notes
- C. The SI checks are executed in the development system and the results are transported into the subsequent systems
- D. The errors from the SI checks must be solved, otherwise. SUM will report an error
Answer: A,B
NEW QUESTION # 17
In ICNV. How database operations synchronized between the source and the target table?
- A. AA
- B. Deletes are directly executed in the target table by delete trigger.
Answer: B
NEW QUESTION # 18
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
- A. To optimize the conversion
- B. To optimize the main import
- C. To optimize the activation
- D. To optimize the migration
Answer: D
NEW QUESTION # 19
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
- A. Downtime conversion
- B. Downtime migration
- C. Silent data migration (SDM)
- D. Shadow on target creation
Answer: B
NEW QUESTION # 20
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
- A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- B. In the job log for the corresponding job in SM37 (Job Overview)
- C. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
- D. In the corresponding R3trans log files of this phase
Answer: B,C
NEW QUESTION # 21
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. A
- B. DMO can only be run with systems NW740 or NW731
- C. Target DB size will increase temporarily
Answer: B,C
NEW QUESTION # 22
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.
- A. It is a database-specific document.
- B. It explains the database migration option (DMO) of SUM.
- C. It explains where to find information about the custom code analysis.
- D. It contains a section about the simplification item (SI) checks.
Answer: C,D
NEW QUESTION # 23
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
- A. Software update
- B. Custom code analysis
- C. Unicode conversion
- D. Database migration
Answer: A,D
NEW QUESTION # 24
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
- B. SUM continues with the next phase and your modifications are kept as In the start release
- C. Before continuing with the next phase SUM asks for a modification adjustment transport
- D. SUM continues with the next phase and your modifications are lost
Answer: B
NEW QUESTION # 25
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:
- A. Move the stack.xml update file into the download folder
- B. Move the SAPM update archive into the download folder
- C. Extract the SAP HANA database installation archive
- D. Move the R3trans update archive into the download folder
- E. Extract the SAP HANA client installation archive
Answer: A,B,E
NEW QUESTION # 26
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question
- A. You can find the optimal number of parallel H3load processes by monitoring host performance
- B. You can record the modification adjustment during migration and use the transports in the next runs.
- C. You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs
- D. You can verify that the content of the download directory matches the stack XML file.
Answer: A,C
NEW QUESTION # 27
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
- A. An overview about possible upgrade paths
- B. The corrections to the SUM Guide
- C. AA
- D. The link to different patch levels to SUM
Answer: A,B,D
NEW QUESTION # 28
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
- A. Parameter file SAPup_add.par
- B. MIGRATE J5T_DUR_XML file from a previous run
- C. Stack XML file calculated by the Maintenance Planner
- D. Breakpoint configuration file SAPUPPHAS.BRK
Answer: B,C
NEW QUESTION # 29
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?
- A. The SAP support packages in the download directory that are newer than the selected support package stack
- B. The SAP support packages of the support package stack, calculated by the maintenance planner
- C. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
- D. The SAP support packages that will be bound to the conversion
Answer: A
NEW QUESTION # 30
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
- A. Import of dictionary objects from the download directory in phase DDIC_UPG
- B. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
- C. Activation of dictionary objects in phase ACT_UPG
- D. Import of upgrade and language data from the download directory in phase TABIM UPG
- E. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
Answer: A,C,D
NEW QUESTION # 31
ICNV initialization does 3
- A. Build index on flag column
- B. Creation of flag
- C. Creation of views
- D. AA
Answer: A,B,C
NEW QUESTION # 32
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:
- A. SYCM (Simplification Database Content)
- B. SAT (Runtime Analysis)
- C. SE80 (Object Navigator)
- D. ATC (ABAP Test Cockpit)
Answer: C,D
NEW QUESTION # 33
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. A Standalone SAP system with ABAP 7.51 or above
- B. AA
- C. An SAP S4HANA 1709 sandbox system
Answer: A,C
NEW QUESTION # 34
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question
- A. Check the Charts Control Center in the SUM Ul
- B. Check the log files written in the SUM directory subdirectory abap. subdirectory log
- C. Check the dump size of the database export on disk.
- D. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
Answer: B,C
NEW QUESTION # 35
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- C. The upgrade of the PRD must be finished before you start new development in the DEV.
- D. The transport between Unicode and non-Unicode systems is forbidden.
Answer: B
NEW QUESTION # 36
......
To pass the SAP E_S4HCON2022 exam, candidates must have a solid understanding of SAP S/4HANA conversion and system upgrade concepts, as well as practical experience in implementing these concepts. E-S4HCON2022 exam is rigorous and requires a deep understanding of SAP technologies and methodologies. Candidates must be able to demonstrate their knowledge and expertise in a variety of areas, including project planning, system integration, and technical problem-solving.
SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade exam is a valuable certification for professionals who want to upgrade their skills in SAP S/4HANA conversion and system upgrade. E-S4HCON2022 exam covers a wide range of topics and is designed to test candidates' knowledge and skills in these areas. SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade certification is highly valued in the industry and can help professionals advance their careers in the SAP ecosystem.
Valid E-S4HCON2022 Exam Dumps Ensure you a HIGH SCORE: https://pdfdumps.free4torrent.com/E-S4HCON2022-valid-dumps-torrent.html